SENSING THE WORLD. CONNECTING YOUR BUSINESS.www.odsenses.com
Review version · Not ready for public launch
ODSENSE / SENSING THE WORLD. CONNECTING YOUR BUSINESS.

Outdoor air & weather sensors

A clear project brief is the first step toward a suitable sensor. Define the conditions before choosing the hardware.

Measurement parameters

Specify the medium, target parameters, measurement range, required accuracy, installation conditions and controller interface. Suitability must be checked against an approved datasheet.

Temperature and humidity sensor

Products

Specifications below are transcribed from the supplier page. Final configuration, calibration and suitability require confirmation before ordering. Source discrepancies require confirmation; no values have been inferred.

Pending confirmation. Share your application, target parameters and integration requirements.
Get a quote

Configuration checklist

01

Define the measurement

Specify the medium, target parameters, measurement range, required accuracy, installation conditions and controller interface. Suitability must be checked against an approved datasheet.

02

Describe the installation

This page outlines project planning, not an installed customer case or a guaranteed outcome. Confirm product suitability, site conditions and the integration plan before procurement.

03

Confirm the integration

RS485 Modbus and LoRaWAN are integration options to discuss, not confirmed features of every product. Check protocol, power supply and network compatibility for the selected model.

Frequently asked questions

How do I choose a suitable sensor?

Specify the medium, target parameters, measurement range, required accuracy, installation conditions and controller interface. Suitability must be checked against an approved datasheet.

Are all communication options standard?

No. Interfaces, power supplies and accessories depend on the confirmed model. Request a written configuration identifying standard and optional items before ordering.

Can I submit an enquiry now?

You can prepare and download an enquiry draft. Mailbox, online submission and WhatsApp are pending configuration; delivery has not been tested.

Planning outdoor environmental measurements

Outdoor installations need a sensor and mounting arrangement suited to the measurement site.

01

Temperature and relative humidity

Define the outdoor conditions and the measurement range needed for the project. Confirm whether a specific sensor and its enclosure are suitable for the intended installation before selecting a model.

02

Site selection and protection

Consider exposure to direct sunlight, rain, nearby heat sources and airflow when choosing a location. Review the need for appropriate shielding and arrange safe access for inspection and maintenance.

03

Power and data integration

Plan power, cable routing and the connection to your monitoring system. Confirm the output signal, accessories and installation requirements with the approved product documentation.

ODSENSE

What do you need to measure?

Share your application, target parameters and integration requirements.

Get a quote